Chapter 54 Eye-catching
In the test field.
More than an hour passed.
Sun Wenming and the person in charge of the test field looked at each other, looking at the unreal range in front of him.
326!
It turned out to be 326 kilometers!
No wonder they were so surprised, after all, the fraudulent electric cars have numbed them.
They usually see that the range of electric vehicles of car companies will be 30% off, and some are even more excessive, not even half of them.
The mileage of an electric car can actually be divided into actual mileage, official mileage, corporate mileage.
The actual mileage is produced by the car owner himself, which is the most real data; the official mileage is tested by the Ministry of Industry and Information Technology’s test site, which is credibility between the ideal value and the real value.
Enterprise mileage is definitely the most unreliable existence. In order to make the data look good and attract consumers, they will mark the ideal value.
"This is the first time I have seen such an honest car company. Their target range is actually measured!" Sun Wenming said with amusement and cry.
The person in charge of the test site looked at the surging and elegant round body and said with a smile:
"Haha, I suddenly appreciate this surging motivation."
"Then let's continue testing."
The Ministry of Industry and Information Technology's test will take at least two months, after all, there are still many details and other aspects to be tested.
Lingnan Mei City.
Fifty freshly baked Haifeng Type 1 wind turbines have been sent to the Thor charging station here.
As for Thor-modified batteries, they were in place half a month ago.
The Thor Charging Station in Dongcheng District, Meicheng has a three-story building covering an area of 300 square meters.
The engineer from Haifeng Wind Power is installing a wind turbine on the roof.
Because other wires and switches, as well as supporting facilities for fixed wind turbines have been prepared in advance.
With the assistance of the crane, a typhoon generator was installed in a long-designed slot.
Several workers tightened the screws in sequence.
Zhang Haifeng personally arrived at the scene to check the installation situation and also inspected the surrounding environment.
Because Meicheng is mountainous, it belongs to the fourth-level wind energy area, that is, wind energy-poor zone.
Dongtang's wind energy is divided into four levels, namely, the rich areas are more abundant and available areas are poor.
Rich and richer areas mainly hit the northwest and northeastern coastal areas.
Therefore, the current wind power plants are concentrated in the northwest, northeast and southeast coastal areas. Among them, the wind energy-rich area in Inner Mongolia has the largest area, and almost the entire province is rich and rich.
How to divide the level of wind energy richness? The rich area means that the effective wind energy power is greater than 200 watts per square meter, the rich area is 150 to 200 watts per square meter, the usable area is 50 to 150 watts per square meter, and the poor area is less than 50 watts per square meter.
Only small wind turbines can be installed in poor areas.
There is also wind in Meicheng, but because the mountain wind is relatively scattered, and sometimes there is no, it is more difficult to use.
"Mr. Zhang, it's installed and you can try to generate electricity."
Hearing the workers' calls, Zhang Haifeng came back to his senses from his thoughts.
"Okay, everyone is ready to start testing power generation."
As soon as Zhang Haifeng finished speaking, the workers started to operate it with great skill.
First they pulled down the brakes of the wind wheel.
Although the wind in Meicheng is not strong, the wind speed is only between 3 and 4 meters per second.
However, the Haifeng Type 1 wind turbine with very low wind speed started and started running immediately.
Zhang Haifeng saw the power generation situation in the computer room next to him, and fifty 50 kilowatt-hour wind turbines were generating power together.
The instrument displays the power generation of 0.42 to 0.49 kilowatt-hours per second. Zhang Haifeng knows that this is not a peak, and the peak should be between 0.55 and 0.6 kilowatt-hours per second.
However, with the wind energy conditions in Meicheng, he was already very satisfied with this number.
According to the current power generation situation, it is estimated that 35,000 to 36,000 kilowatt-hours of electricity can be generated in one day.
Calculated based on the surging and elegant charging capacity, the power generation on this day can meet the charging needs of at least 600 surging and elegant vehicles. If it is an electric car, it is estimated that it can charge tens of thousands of vehicles.
In other words, this charging station does not require power to the Dongtang Power Grid. If the power storage is really insufficient, then replenish it from the power grid.
At least it is definitely enough now. After all, Pengpai Power's electric cars have not been launched yet. Those who come to charge are Thor's electric cars. These electric donkeys can charge about two or three kilowatts at a time.
Therefore, the power storage of Thor's charging stations is temporarily surplus.
Huang Haojie has already asked Fang Shengjie to negotiate with Dongtang Power Grid Company about wind power grid connection.
Why Fang Shengjie went? It is mainly because Haifeng Wind Power Company is a subsidiary of Thunderstor Group.
Moreover, Thor's comprehensive service company is not only its own charging stations. The charging stations built by other Thor's companies must be guided by Thor's comprehensive service company.
All Thor's charging stations are controlled by the overall system of Thor's Comprehensive Service Company. That is to say, every charging station has a storage capacity and a power generation every day, and they can see clearly through the overall system.
For the charging stations of Yadi and other companies, Raytheon Comprehensive Services has the power to dispatch their power storage and generation power, and there are also 20% of the charging station revenue.
The boss of Dongtang Power Grid Company is busy looking through the report sent by his assistant.
Hum? Thunder Group’s wind power grid connection application? Aren’t they used batteries? How to start wind power?
After looking through the application form of Thunder Group, he became more and more shocked the more he read it.
Power storage-charging stations plus wind power are planned to achieve an annual power generation of 4 to 6 billion kilowatt-hours, and a wind power generation group is planned to establish a wind power plant group in the coastal areas of eastern Guangdong, with an annual power generation of 20 billion kilowatt-hours.
You should know that Dongtang’s wind power generation scale this year is only about 240 billion kilowatt-hours.
If you, the Thunder Group, want to achieve the national wind power production capacity of 10, you are not bragging.
However, when he saw the technical parameters of the Thor-modified battery and Haifeng Type 1 wind turbine, he couldn't help but wiped his eyes.
A battery with an energy density of 240 watt-hours per kilogram? A vertical wind turbine with a power generation of 52 to 55? Is it a joke?
The boss of Dongtang Power Grid immediately calculated that if the data is true, it means that wind power and photovoltaics will enter a controllable state in the future.
Instead of generating one kilowatt-hour of electricity now, wasting half a kilowatt-hour in energy conversion.
In addition, the contradiction between peak electricity consumption and low electricity consumption can also be avoided.
Taking Lingnan as an example, we can see the contradiction: the electricity consumption in summer is greater than that in winter is greater than that in winter than at night.
In this case, the time and space of electricity consumption are uneven, which leads to the inequality of power generation.
The problem is that it is very simple to use electricity in a time and space, while it is a big problem to use electricity in a time and space.
Because the efficiency of power stations is the lowest when operating at low power, if a ton of coal can generate 2,500 kWh of electricity when operating at high power, then when operating at low power, one ton of coal may generate less than 2,000 kWh of electricity.
In addition, unstable power supplies such as wind power and photoelectricity are affected by natural factors and are large and small in power generation, which brings huge troubles to the grid connection management of the power grid.
After thinking for a while, the boss of Dongtang Power Grid decided to take the time to visit Shanmei, Lingnan.
If it is true, it can save at least 10 to 20 electricity to Dongtang every year, and at the same time reduce the power generation cost.
He approved the Thunder Group's application for connection to the network and asked his assistant to arrange the time.
Chapter completed!