Font
Large
Medium
Small
Night
Prev Index    Favorite NextPage

Chapter 319 Xinghui Speed, Installation Completed in Two Days(1/3)

Xu Xiuzhen was surprised. For a person without design concepts, there was a set of models that could be presented in front of her eyes, and clearly expressed what the products she purchased looked like.

It's really better.

No matter how good the picture is, there is no peace of mind from the real thing.

Xu Xiuzhen was very excited in the model room, looked left, looked right, touched it, then touched.

Lu Wenliang laughed and took her around.

Finally, she replaced her to the kitchen and visited the pull baskets, pendants, appliances and accessories in the kitchen.

In the bedroom, I saw the clue drawer, plaid rack, trousers and other components said in the bedroom.

There is no need to continue to introduce Li Wenliang. When she sees the actual object and understands the role of these accessories, she places an order directly with Xinghui Home.

The new hardware accessories are not expensive, all of which are 2880 yuan.

In fact, she is also very interesting in the soft and accessories of a full set of homes. Unfortunately, the price is relatively high and it takes tens of thousands of thousands. She is a little reluctant.

Later, only the hardware accessories were added.

After the two returned to the card.

As for the total number of products, product categories, product quantity and product prices, the final agreement has been reached.

There are more than 0.78 projection area in the whole house. Xinghui Home Furnishing is a discount to help her free.

Make her happy for a while, after all, there are more than 1,000 yuan.

at last!

Xu Xiuzhen officially signed in the contract and paid the corresponding money.

After completing the contract, she left Xinghui Home Furnishing Store with a cheerful face.

Xinghui Home also helped the taxi who called her intimately and paid the fee.

After Xu Xiuzhen left, the Li Wenliang team returned to the second floor and opened a short meeting to summarize some of the rules of this order.

Especially in the aspects of cutting beams and pillars.

One of the assistants nodded.

These three assistants brought by Li Wenliang are two room assistants, and a CAD painting assistant.

After opening a short meeting, CAD painting assistant began to get busy.

He first fine -tuned the data obtained by the measurement of the quantitative house on the plane apartment diagram passed by the decoration company.

Then the area involved in home products will be replaced with the plane map of the simple product and calligraphy of the decoration company, and the flat map of Xinghui Home has long been prepared.

Because Xu Xiuzhen's products have long been preset.

Therefore, CAD painting assistants are very convenient to handle the drawings. The job he wants to do is to find related product numbers in many drawings.

Open the CAD and copy and paste it under the total apartment diagram.

A total of 8 products, which cost less than 5 minutes before and after.

Then use the actual product size to fine -tune the product.

For example, a 2 -meter shoe cabinet uses a preset of two meters. In which part of the 100mm that will be added with the customer?

In the remarks of the demand table for each portion, there are clear explanations.

Filtering is also very simple. As long as you use an incremental part to add, it costs less than 30 seconds before and after.

It is worth mentioning.

On the sealing board around the product, Wei Zhijie used the double -seal version of the cross -wall method only after 2018.

Normal products, if the height is 2 meters and 48, the general product is made of 2 meters and the top seal is 8 cm.

If the ceiling of the customer's house is tilted, one is 2 meters 47 and the other end is 2 meters 48 o'clock.

You need to install the master at the scene to cut off the excess part according to the inclination.

Because there is no way to carry large woodworking equipment on the spot, you can only use a curve saw, or the angle grinding machine is replaced with a woodworking saw piece for cutting.

This operation will not only be at the scene, cause a large amount of wood chips, but also to form a very harsh noise.

And Wei Zhijie directly upgraded the approach of the top version.

Make two 6 cm high seals.

The front seal plate and the door panel are flat, and the rear seal can be adjusted according to the actual height of the top.

In this way, although there will be two centimeters of gap stairs between the front cover plate and the ceiling.

But it eliminates the trouble of cutting on the spot.

In terms of sales, it can be guided with customers. The inclined non -home enterprise of the ceiling can cause damage to the board on the spot. When the board is exposed, even if it is moldy and moisture, it will cause damage to the plate after a long time.

And do this double -sealing board. Although there are 1 to 3 cm on the top, the whole practice is more environmentally friendly.

After using this double -sealing board to cross the process.

The installation of the home is not only simple. When the measurement is wrong, it can also be remedied to the greatest extent.

CAD painting assistant, adjust the size of the 8 sets of products.

Open the product procurement details, and hand in the computer with handwriting and clients in the computer for a 1: 1 restoration and finishing.

Then find the corresponding projection area, fill in the product -related unit price, and find the sum of the product price.

Fill in the newly added products of the customer clearly.

The part of the product projection clarify the settlement price of Xinghui Home and Decoration Company, the new part of the customer, and the rebate of Xinghui Home Furnishing to the decoration company.

Fill in this part of the data into the product purchase contract.

Eventually, the product CAD drawings, product prices and product procurement contracts were finally sorted out, and the main designer was reviewed.

If there is no error in the file, you can upload the relevant documents to the order design results attachment through the Xinghui Home Service Platform.

Sending it back to the decoration company to confirm.

After the decoration company downloads the three documents, the design review and financial audit.

Both reviews are confirmed, and the order department of the decoration company will be officially issued to the Xinghui Home Factory.

March 20th morning.

Li Wenliang led the three assistants, set off at 9 am, arrived at the owner's house at 9:30, and took half an hour in the full room.

Return to commercial and residential villas in the half -mountain peninsula at 10 o'clock, Xinghui Home Furnishing Store.

Start the service at 10:30, complete the contract at 11 o'clock, and then organize three documents.

At 11:30, return the decoration company to confirm.

Because the first order is more excited, the supporting company's cooperation is very high. It took only 20 minutes before and after, and confirmed the order and conveyed it to Xinghui Home Factory.

11:45, the order operation department led by the master Li Jia officially received the first home order issued by the decoration company.

After the order review department downloads and reviews the three documents, no problem is found. After 10 minutes, the order is officially received and the dismantling department is submitted for disassembly.

After receiving the home order, after coming to the dismantling department, the auditors of the Disclosure Department are also first reviewed to the product.

After confirming that it is correct, submit Lin Chuanmu as a disassembly person for disassembling orders.

If the disassembly software is not preset, after receiving the CAD drawing of the single disassembly, the dismantling person.

You need to analyze the product structure first, and then pull the product frame of the product according to the product characteristics, and then arrange the vertical board, fixed layer board, activity plate, back plate and other parts in the product.

Finally, add drawers, plaid racks, trousers, clothing rods, etc. according to functional components, hardware accessories.

Finally, add the door panel, handle, sealed board and other components.

According to the normal disassembly method, it takes about half an hour to disassemble a set of home products. Taking Ms. Xu Xiuzhen's order as an example, 8 products need to be disassembled for 4 hours.

After the product is preset.

What the dismantling person needs to do is to enter the product model in the product price details, enter the search box.

You can mobilize this product, preset a formal disassembly document.

After mixing the disassembly file, adjust the various parameters of the product according to the product price, such as product size, cabinet color, door panel color, handle, hardware accessories, etc.

The entire adjustment time does not exceed 5 minutes.

Such disassembly links can be increased from the past 4 hours to 40 minutes.

Efficiency has been improved by 6 times.

This is the preset power. Of course, the preset requires a very strong predictability. It requires many years of experience to summarize in order to create the preset products very popular.

After the disassembly worker organizes the disassembly file, submit it to the supervisor for review.

After the review is completed, the planning department will disassemble the order.

In this process, the software will be diverted according to the characteristics of the product.

What products need to be produced by foreign associations.
To be continued...
Prev Index    Favorite NextPage