Chapter 087: Work Summary(1/3)
On the way back, Fang Jianshe consulted Wei Zhijie about his future plans.
Wei Zhijie confessed part of the content, including his plan to establish a new home furnishing brand.
According to Wei Zhijie's vision, direct-operated stores will be opened in several major cities in Qiong Province early next year.
Otherwise, the designers and installers on the project, including the workers at Linjiang Stone Factory, would be difficult to maintain.
After all, before this year, the production of 20,000 sets had to be completed in three months, calculated as 7,000 sets per month, but after the new year, the quantity will drop sharply.
The remaining 230,000 units are allocated to 9 years, which is only 25,000 units per year. In addition, Hutao takes orders at a rate of 66%.
It’s equivalent to getting 16,500 units a year. Calculated over 11 months, it’s only 1,500 units per month.
Compared with the peak of 7,000 sets, it is not even a little bit behind.
Even if the number of people making quick money is reduced by half after the new year, 4,000 units can still be digested.
There are currently 2,500 vacancies.
If after this year, we start to get involved in hotel projects in Qiong Province and start to provide household products, especially bathroom cabinet products, it is expected that there will be a gap period in the short term.
Just as Wu Jianguo guessed, Wei Zhijie is definitely not a person who sits still and waits for death.
On the way to Qiong Province for the first time, he had made his intentions clear to Zhang Yufei. If Hu Tao's strategy could fit with his, then both parties would continue to cooperate.
After all, Hutao Group serves no less than 100 hotels every year. Even if it only takes one-third of the volume, there will be no shortage of home furnishing products.
The direct-operated stores are his layout for the next three to five years.
It took three years to develop ten stores, which was enough for Wei Zhijie to quickly expand at a certain period of time.
It was the first time that Fang Jianshe heard Wei Zhijie's plans for the future. He also knew that Wei Zhijie could not tell him too clearly now, but just knowing this was enough to shock him.
This is an absolute business wizard.
And he is also a responsible leader. In the conversations between the two parties, the most common sentence Fang Jianshe heard was that I must find a way out for those who are willing to work hard with me.
The return journey is very short, only about twenty minutes to get back to Linjiang Village.
Fang Jianshe drove the car directly to Fang Dafei's house, and several cars followed him.
After getting off the bus, child Zhao Xinxin ran over with a sad look on her face and grabbed Wei Zhijie's hand tightly.
Because she had to talk about business just now, Zhao Xinxin arranged to sit in Zhao Yanan's car seat and was held by Fang Zhengxin.
Lunch will be eaten directly at Fang Dafei’s house.
Fang Dafei's wife, following Mr. Fang's instructions, cooked a large table of dishes.
They are all specialties of Qiong Province, and everyone had a great time eating them.
Zhao Xinxin’s child was very happy to eat, especially the insect chrysalis. The little one didn’t know what the raw materials were.
The outer layer is coated with flour, and the inside is crispy and chicken-flavored.
After lunch, everyone dispersed.
Wei Zhijie took Zhao Yanan and Zhao Xinxin back to the military supply warehouse and had to take a break at noon.
Zhao Xinxin fell asleep in Zhao Yanan's arms as soon as she got in the car.
When the car was about to exit Linjiang Village Road and merge with the provincial highway, Wei Zhijie suddenly turned the car onto an abandoned factory road.
Put Zhao Xinxin on the back seat to sleep.
Wei Zhijie tilted a chair in the middle of the commercial vehicle, grabbed Zhao Yanan with an angry face, and made her kneel on the leather seat.
Wei Zhijie gave a bad laugh and rushed forward.
...5,000 words were deleted after review...
With the help of the three keywords of car, wild, and last, the two of them quickly flew into the clouds.
It trembled and fell down.
Cleaned up slightly.
Official return trip.
After returning to Villa No. 2 in the munitions warehouse, Wei Zhijie took Zhao Xinxin back to the master bedroom and took a nap together.
The little girl slept soundly.
Amid Zhao Jingwen's suspicious look, Zhao Yanan washed up and rested in the guest room.
Zhao Jingwen always felt that her cousin must have taken some supplements secretly, and she felt that her complexion had improved a lot.
13:45 pm
Wei Zhijie woke up from the big bed and saw Zhao Xinxin still sleeping soundly.
He got up gently and went to the bathroom to wash up.
After washing, he went to the study room in the master bedroom, opened his laptop, and began to organize the data of the past few days.
I've been running around here and there these past few days, and I haven't been able to digest the data properly.
Open the work summary sheet.
In terms of mapping data:
The college's design assistants started mapping on the 22nd, and the total number counted that day was 1,120 sets.
Judging from this data, 15 teams completed an average of 74 sets a day. The on-site mapping time was 6 hours. Each team consisted of 4 teams of 8 people and completed 12 sets per hour, which is equivalent to mapping 3 entire houses in one hour.
This data is relatively reasonable.
In Zhao Jingwen's report, on the morning of the 22nd, many teams had abnormal data, reaching as many as 80 sets. In the afternoon, many senior brothers and sisters took their teams to check the data in the morning.
Some teams did not have mapping data in the afternoon, so they probably corrected the mapping data in the morning.
There are 1,216 sets on the 23rd and 1,245 sets on the 24th.
There were 542 sets on the 25th, and 551 sets on the 26th yesterday.
This is planned data.
The designer's job is not only mapping, but also deepening the drawings based on the mapping data and connecting them with the factory.
They also have an important job, which is to follow the installation masters and review the data for errors. When errors are encountered, they need to negotiate with the installation masters on site on how to solve them.
If it needs to be redone, collect the data immediately and come back to draw up after-sales service or place an order.
After the installation started on the afternoon of the 25th, each team sent 4 design assistants to do the mapping, 2 design assistants went to the munitions warehouse office to deepen the drawings, and 2 design assistants went to the site to follow the installation masters to follow up on the installation progress.
So! Starting from the 25th, the mapping data is 4 people per team, mapping for 6 hours a day, and each team mapping 3 sets per hour. Calculated, the average number per team is 36 sets, which is about 540 sets per day.
This is why so many design teams are needed.
Calculated based on 540 sets per day, there are an average of 32 projections per set, with a coefficient of 4.2 per projection.
It can map out 72,000 square meters of products every day, equivalent to 24,000 large boards.
Production:
Since the 23rd, it has stabilized at around 15,000 large boards.
No. 23: 15026 photos, No. 24: 15103 photos, No. 25: 15121 photos, No. 26: 15139 photos.
There won't be much difference here for the time being, unless you encounter some more difficult products, such as cutting corners or cutting pillars.
Otherwise this data will persist for a long time.
Transportation:
On the 25th, eight 10-meter pallet trucks were delivered to the site, weighing 240 tons, with an average of 30 tons per truck.
It was also 240 tons on the 26th, and today on the morning of the 27th, it was also 240 tons.
It is expected that the goods from the foundry will arrive tomorrow morning. According to the plan, 4 ten-meter pallet trucks should arrive.
It is worth mentioning that a ten-meter truck is just a noun, and the actual truck is 13 meters long with the front end.
This model is an A2 driver's license, has a load capacity of 32 tons, and can pull up to 66 tons.
But if you pull the maximum weight, it will be very miserable if you get caught.
Installation aspect ""
On the 25th, since the installation was only done for one afternoon, the data on the 25th was 268 sets.
There are 437 sets on the 26th.
If nothing unexpected happens, the daily supply of about 420 sets can still be guaranteed.
This is due to Wei Zhijie's optimized structure.
The product's panels and back pull panels are reduced.
However, the back panel also has guide holes, so the installation master can install it almost without thinking.
If the product is designed according to the structure using the largest plate.
A group of masters can install two whole houses in one day and they are already smiling.
To be continued...