Font
Large
Medium
Small
Night
Prev Index    Favorite Next

Chapter 251: Building Roads with All Effort

Powerful Career - Chapter 251: Go all out to build roads

There is no airtight wall in the city. Although the Provincial Party Committee Standing Committee meeting has strict discipline and matters decided at the meeting cannot be leaked. But basically, discipline is discipline, and anything you want to say out is still a rumor.

The Standing Committee of the Provincial Party Committee has just finished its meeting, and there are already rumors in Xizhou official circles that Sidaogou Town has been designated as a pilot area for transforming the province's economic development model, and has also been upgraded to a provincial-level economic and technological development zone.

Regarding such rumors, Lu Yan was skeptical at first. The fact that Sidaogou Town was designated as a pilot area for transforming the province's economic development mode seemed to Lu Yan to be very reliable. As for the latter one, it was upgraded to

Provincial Economic and Technological Development Zone, Lu Yan felt that someone must be spreading rumors.

The first reason why I think this is because I haven't heard even a little bit of news about "upgrading" before. According to the practice of the officialdom, if this kind of thing happens, at least Ren Jianjun's level will hear some news in advance, but now

There was no sign whatsoever, and when such a decision came out, Lu Yan really couldn't believe it.

It wasn't until the third day after the Provincial Party Committee Standing Committee meeting that Gao Jia called and mentioned the Economic and Technological Development Zone in a roundabout way that Lu Yan felt that this matter was not groundless.

With Gao Jia's identity and status, such words must not be without purpose. Moreover, Gao Jia is a very cautious person. Although he did not speak clearly clearly, Lu Yan could already tell from the lines of his words that Sidaogou Town "

The matter of "upgrade" seems to be finalized now.

Later, when Lin Zhijie talked about this matter again, Lu Yan knew that this matter was most likely a foregone conclusion. Lin Zhijie got the news from his friends at the Provincial Development and Reform Commission. The Standing Committee of the Provincial Party Committee instructed the Provincial Development and Reform Commission to draft relevant regulations.

Documents related to Sidaogou Town being upgraded to a provincial economic and technological development zone. It was now confirmed that the rumors among the public were not false.

However, Lu Yan took the matter of Sidaogou Town being upgraded very lightly. In fact, regardless of whether it is upgraded or not, Sidaogou Town already has a lot of power since it was listed as a pilot area for transforming the economic development model.

.Especially in the area of ​​approval authority, the authority of some Kou Shang pilot areas is greater than that of Hongchuan County.

On the other hand, Lu Yan himself is also a person who is indifferent to fame and fortune. Unlike some cadres, he does not take promotion and wealth as seriously. In his view, no matter what position he is in, as long as he can really make a difference,

His own talent is enough. In fact, if he was really a person who valued power and position, he would not have chosen to take a temporary job in Sidaogou Town for training.

Moreover, Lu Yan really didn't have the energy during this period to think about these things.

During this period, the development of Sidaogou Town has also entered a fast lane. In addition to the previous Sidaogou Cement Plant, which has been completed and put into operation, and the cement supply is now in short supply, 80% of the CICC Jieling Gold Mine Project has been completed.

The civil engineering works and equipment debugging are also in progress, and it is expected to be officially put into operation by the end of June.

The biggest problem facing CICC's Jieling Gold Mine now is transportation. Mining is a very large project. It is not only an equipment problem, but also requires some large-scale mechanical operations. At the same time, the transportation task is also heavy. Now Sidaogou

The only way the town can connect to the outside world is through the original old road, which is far from meeting the needs of CICC after it is put into operation. Therefore, it also objectively affects the progress of the project.

Longhua Group's drinking water production project is now basically ready for production. Qin Ruonan and Zhang Xilan came here once each to carefully check the construction progress of the project and the protection of water sources. They also reviewed the work done in Sidaogou Town during this period.

The work is still very satisfying.

The peak season for beverage sales is about to begin. The drinking water plant invested by Longhua Group in Sidaogou Town is now ready to go into operation. The only thing waiting for is the completion of two roads in Sidaogou Town.

After all, drinking water production is different from other industries. Although Sidaogou Town has unique natural conditions and excellent water quality, the drinking water industry is still an industry that relies heavily on the market. Although the "Longhua" brand is very bright, Sidaogou Town

If the traffic situation in Gou Town is not solved, the produced drinking water will not be transported out of the country, and good economic benefits will still not be achieved.

Coupled with several real estate projects in Sidaogou Town, they are now also hampered by the traffic conditions in Sidaogou Town.

The road problem was not particularly obvious before, but now it has become the most important factor restricting the economic development of Sidaogou Town. Lu Yan convened several meetings with the town team members and raised the issue of road construction to the fourth level.

The current top priority of Daogou Town is that all members of the town team implement segmented contracting. There are four people on each of the two roads currently under construction. They eat and work at the construction site to fully promote the project construction.

Lu Yan, however, focused his main energy on coordination, coordinating and solving problems that arose during the road construction process as soon as possible.

The Hongchuan County Party Committee and County Government also gave strong support to the construction of these two roads. Ren Jianjun organized a meeting of the Standing Committee of the County Party Committee to arrange and deploy relevant county departments to open a "green channel" for the Waitong Highway in Sidaogou Town. County Mayor Wang Xueshi

Led the transportation, development and reform, construction and other departments to go to the road construction site several times to coordinate and solve problems.

The investors in the construction of the two highways, CICC Group and Longhua Group, are also very powerful. In order to speed up the progress of the project, they have successively increased their investment in road construction, and the logistics service guarantee is also in place.

Another bit of good news is that the construction scope of the two roads does not involve land acquisition and demolition issues. Although the terrain conditions along the line are relatively complex, the current technical conditions can already solve these problems, coupled with the guarantee of funds

in place, so it did not affect the progress of the project.

However, the pursuit of speed is one thing, and Lu Yan has not relaxed the quality requirements of road projects at all. In Lu Yan's view, after the completion of these two roads, they will serve as a strong guarantee for the economic development of Sidaogou Town in the future. Therefore,

Absolutely no carelessness.

While keeping abreast of the progress of the project, Sidaogou Town team members also have another "supervisory" task, which is to supervise the project construction unit to ensure the quality of road project construction. Lu Yan does not want to see such laborious road construction just for the sake of

Just to deal with the errands at hand, it was repaired and repaired just a few years after it was opened to traffic.

After concerted efforts from top to bottom, the construction speed of the two roads connecting Sidaogou Town and Hongchuan County was quite fast. In mid-May, both roads had completed the main construction of the project, and the entire line was connected.
Chapter completed!
Prev Index    Favorite Next