Font
Large
Medium
Small
Night
Prev Index    Favorite Next

Chapter 104 Trial Operation

When they arrived at the construction site, there was already a huge temporary warehouse nearby, which was preparing for this road construction. I saw that the warehouse was brightly lit and dozens of people were sitting on chairs waiting quietly. However, if someone watched it up close, they would definitely see their fingers inserted into a dedicated socket.

Recharge quietly.

Most of these terminators are T300 type terminators, a small number of T400 terminators. They performed a large number of tasks some time ago. It is understandable to charge and replenish energy.

Song Yang and the others quietly looked at the people in front of them and sighed: "Your workers look like soldiers. They are always so meticulous. This puts a lot of pressure on their hearts."

The prince next to him nodded in agreement.

Only Si Fan looked at them strangely, his eyes full of weirdness.

"What are you two doing here? Are you okay to do it?" Si Fan asked.

The two were stunned at the same time.

"We are waiting for you to start construction. Let's see how your construction is. I have never seen how such a large machine works. I have seen a lot of high-end equipment in developed countries. But I have never seen many such large equipment." Song Yang said complimentally.

The prince next to him looked at Song Yang with contempt, but still nodded.

Si Fan glared at them.

"During construction, you can only see from a distance and not get close. The construction speed is too fast, so don't hurt you. A rich second generation and a prince. If it is broken, I can't afford to compensate!"

After saying that, he shouted at the Terminator opposite, and immediately saw that the Terminators all stood up and lined up in an orderly manner to accept Si Fan's review.

"The construction started, according to the previous design pattern, plant transplantation is placed at the end, and the process in front is completed at one time!" After Si Fan made arrangements, he immediately saw the Terminators scattered like an army and rushed to the back of the huge construction machine in front.

The T707 Highway Trail Blazer Terminator weighs 120 tons, which is so huge in the desert at this time. Si Fan is still nervous now. It is not accidental that this huge Terminator can appear here. This is all Si Fan's company's working capital, selling the entire European garden money, plus all the company's funds and their original capital.

Even so, Si Fan still owed 500 million yuan in bank loans, which exceeded the limit that Si Fan could bear. In order to make this road fire the first shot and become the only contractor of the solar highway in the world.

Is there still a fear that there will be no project to do? At that time, this giant will be an old hen who can lay golden eggs.

After Si Fan gave the order, he pulled two people into the shed just now, and there were more than a dozen large trucks driving by the Terminator.

"What is this for? Why are they constantly transporting things?" Song Yang asked Si Fan in confusion about the construction of the highway. There was no plan to see in front of him, and no one even got the roadbed in advance. What should he do? He had no idea how exaggerated the T707 highway pioneers in front of him were.

According to his understanding, a highway is contracted in sections. Even if it is not contracted according to sections, it is still built according to sections, but the current situation is different. It seems to be focusing on this huge machine.

And they all looked at it in a dark way.

Only Si Fan was a little bitter. The current start-up was not the formal start, but the trial operation stage of the machine.

When the construction officially starts, there will be a lot of professionals such as supervision engineers and surveyors next to you... visit.

That’s right! They can only visit, because the paving of the road in front of them will definitely break all their conjectures about road construction.

"Now you can watch it. Let's start with half an hour to see how fast the efficiency is. By the way, give Your Highness a reassurance to let you not be so nervous." Si Fan pointed to the road ahead.

"If you want to build a highway, you must first lay a good roadbed! This roadbed is the foundation of a road, but we are different. All equipment can be handled at one time, including solar power generation equipment. However, the installation of this equipment is in a confidential state. Visits are prohibited." Si Fan explained.

After a while, the prince next to him suddenly said.

"You just said that the road surface needs a roadbed? Then how do you get it done at once?" the prince asked.

At this moment, I saw countless heavy tools suddenly stretching out from the huge equipment that looked like a full metal big belly truck, and it seemed like a storm was passing on the ground.

The entire soft semi-gravel structure of the ground was turned over, and a large amount of other materials were mixed into it to change the quality of it, and then completely compacted! There was absolutely no hesitation! Before compacting, an underground pipeline was actually inserted directly into the ground for five meters! In the future, various wires such as cables and optical fibers can be connected.

This is a very exaggerated efficiency. It should have been done in one piece of work now. The T707 Highway Trail Blazers have been moving on the Z-shaped route, and each piece of road has been processed.

The prince and Song Yang were both confused. They really didn't know what the machine was doing when working. And they often sprayed out white gas when they were working, and no one knew what the gas was.

But they will know soon.

After more than ten minutes, they looked at the road in front of them incredibly. The road was completely built. What was left behind the T707 was the road that people often saw, but these roads were a little different. On the roads in front of them, there were some dense grids, as if metal was inserted under the road.

The road surface does not look as rough as the road before, but the details have been changed! Special craftsmanship makes it strong friction. The large number of inclined surfaces of the highway here have smooth vision, which seems to have been specially treated.

The highway is a regular eight-row road with four straight roads, which is normal, but there is a substation buried deep underground on the ground on one side of the starting point of the road.

There is nothing else. It makes people feel as if they are on a relatively unique and creative highway.

However, Si Fan still explained the answer to them.
Chapter completed!
Prev Index    Favorite Next