Font
Large
Medium
Small
Night
Prev Index    Favorite Next

Chapter 1783 Inspecting the Husky Research Institute Project

The construction of the Southeast Fourth Construction began in early February, but the project at the institute is not large. The real large size is the research institute supporting community 800 meters south, so the project is set up in the residential community.

The overall area of ​​the supporting communities is actually twice as large as the area of ​​the institute itself, reaching 240,000 square meters, but 240,000 square meters are evenly divided into 6 districts, and only one of them has been started this year.

The district has 40,000 square meters of land and a total of 600 houses are built, almost all of which are small four-bedroom apartments of more than 120 square meters.

Because there are not many people in the project company, Jiangnan doesn’t want more people to know about it, so Jiangnan plans to do his own things in daily inspections and some management work by himself and no longer deal with others.

Jiangnan and Yang Wei went to the research institute first and looked at a large wasteland on which was lonely, with tall pile drivers standing. Apart from this, there were almost no workers.

Yang Wei asked: "Jiangnan, although I don't understand the construction industry, I have seen many projects in our company. Generally, small buildings with five or six floors do not drive piles. Why does this five-story scientific research building still drive piles?

?”

The scientific research building is piled, but there is no piled on the three-story canteen next to it.

Jiang Nan smiled and said, "As for the scientific research building, the structure's seismic resistance level is set relatively high, and the settlement control is relatively strict, so piles need to be driven."

In fact, not only the details of pile driving, but also the bearing capacity design of the beams, slabs and columns of this building are much higher than that of ordinary civil buildings. After all, it is your own scientific research building, and there are no restrictions on economic indicators. You can build any standard as high as you want.

Yang Wei nodded and said, "Then have you considered it? What are the first scientific research project here? "

Jiang Nan said: "I haven't figured out the specific ones yet, and I have initially formulated a direction, which is the intelligent system for community management and property management."

Yang Wei was puzzled and asked: "What is an intelligent community management system?"

Jiangnan said: "It's just because it's a system, so it's hard to say it in one or two sentences. Generally speaking, through the combination of software and hardware, the community property management is incorporated into systematization and intelligence to ensure that the minimum number of staff is used to achieve the best quality.

Service and the most sophisticated management are a complete system that will be applied to our own Changying Real Estate Community and the communities developed by Chuanlian Real Estate in the future.”

The reason why Jiangnan considers starting with the intelligent management system of the community is that whether it is the Jiangnan town developed by Changying Real Estate or the community developed by Chuanlian Real Estate, all properties are used by Chuanlian Property.

Since the beginning of real estate development, especially since the establishment of Chuanxianglian, Jiangnan has always paid great attention to property management and services, so it was the first to develop this intelligent management system in the community, because this system is easier to convert into products first, and produce

On the basis of generating benefits, further develop in some related disciplines and ultimately realize the national production of the entire system. Of course, with the emergence of various new technologies, the entire system will continue to achieve self-upgradation.

As for the functions that this system needs to achieve in the early stage, it is the goals and directions that the newly formed scientific research team needs to formulate, but Jiangnan will provide them with a comprehensive idea.

Of course, if this system can be successfully operated, then saving property management costs is the secondary purpose, realizing high-quality management of ordinary communities and improving the brand competitiveness of Changying Real Estate and Sichuan Lian Real Estate communities is the ultimate commercial purpose.

The research institute in Jiangnan was mainly focused on application research in the early stage, and it was the basic life application, not the high-end and sophisticated application. Everything was done bit by bit, and talents were also accumulated bit by bit.

It is impossible to develop chips at the beginning and high-end manufacturing is not possible. Even if you are lucky enough to produce results, you may not be able to put them into practical applications, because there is still a long way to go between scientific research results and mass production.

Yang Wei thought for a long time before saying, "Oh, it sounds very advanced. I feel that our Erha Software Company can develop it."

Jiang Nan smiled and said, "It must be necessary to have talents in computer software."

The two of them stood at the institute for a while and then went to the institute community to the south.

In fact, the project name of this community is not called the Research Institute Community, but the Husky No. 1, Tonghe District, Didu City. Later, it is called the Second Garden, the Third Garden... and finally it reaches the Sixth Garden.

When we arrived at the project, Jiangnan met Liu Yidong, the project manager of Southeast Fourth Construction Company, who was responsible here.

Before Liu Yidong was acquired in Southeast Fourth Construction, he was an employee of Tonghe Construction. Moreover, their family was in Tonghe District, not far from the research institute project, so he actively undertakes this project just for convenience. He goes home early every day after get off work, and his son will go to high school in the second half of this year. Liu Yidong also hopes that he can take more time to accompany him.

As a first-level project manager, the construction of the research institute project was easy to obtain, so after pouring tea for Jiangnan and Yang Wei, Liu Yidong took the initiative to report on the project construction plan and the progress of the current stage.

Regardless of whether the boss listens or not, just recite a few more words to let the boss know that he is indeed working, which is what most workers think.

After Liu Yidong finished reporting, Yang Wei asked: "Manager Liu, I think there are fewer workers and managers on the construction site now, and we have not seen the canteen on the construction site. How do your managers eat?"

Jiang Nan and Liu Yidong were both surprised when asked this sentence, and Yang Wei was still concerned about such details.

Liu Yidong said: "We are in the early stage of pile driving. The canteen at the institute is also in the stage of digging the foundation, so the on-site workers do not need the canteen. Some subcontractors have delivered food to them. We manage these on-site

The staff went to Huanya Construction Engineering in front for dinner. Huanya Construction Engineering was very close to us, so we paid them the food fee. When the project was fully started, we had our own canteen and we would have dinner at the construction site.



Speaking of Huanya Construction Engineering, Jiang Nan smiled and said, "Ayi Xiamu is in the imperial capital now. Let's go over and take a look. Let's have a meal at Ayi Xiamu at noon."

After discussing the share changes of the Huanya company last time, Yang Wei will represent Jiangnan and join Aixiamu and Ma Jing to establish a new Huanya Holdings Co., Ltd. on the border, because Jiangnan is the largest.

Shareholder, the chairman of Huanya Holdings, will definitely be Jiangnan in the future. However, if it is a general matter, Jiangnan will not go to the frontier without any trouble, so most of the time, Yang Wei will do it on his behalf.

Jiang Nan thought to take advantage of today's opportunity to let Yang Wei have some contact with Ayi Xiamu again;
Chapter completed!
Prev Index    Favorite Next