Font
Large
Medium
Small
Night
Prev Index    Favorite Next

Chapter 100: Site Selection

When Zhang Ruolin returned to the multi-functional hotel, Gao Pi, Kun Qiming and Wukong were thinking about how to deal with the project construction time problem.

Entered the office.

Zhang Ruolin asked Luo Ran to print out the pictures of the planning map, and several people needed to identify the project land.

Wukong asked:

"Boss, this time Quanliangliang takes the initiative to invite you over. Is there any conspiracy? I have heard that Quanliangliang is very close to Mo Yuchen."

Hearing this, Zhang Ruolin thought for a while and said:

"This time it shouldn't be like a trap for us, otherwise he wouldn't have let me suppress the news. I guess this time he also received instructions that he cannot disobey."

"Let's ignore this for now. How are the people at the design institute doing?"

Wukong looked at his watch and said:

"We should be there in ten minutes. Boss, if you want the designer to help you select a location, I told him on the phone."

Zhang Ruolin asked:

"Can the person who comes here be trusted? I have already promised Quanliang that I will keep his secret."

Wukong replied with a smile:

"Boss, if nothing else, I must be trustworthy, and he also told me about the trends at Oshi Capital."

Zhang Ruolin nodded.

Luo Ran printed the picture, and after walking in, he sent one to several people.

When Kun Qiming saw the drawings for the first time, he was not calm.

Kun Qiming opened his mouth and said:

"Boss, come and see, the location of plots 15-25 is very strange. I am familiar with this area. Starting from plot 16, most of them are bungalows owned by residents of the southern district."

"Plots 1 to 15 and plots 16 to 25 are only separated by a road that is not a main road, but the scenery on both sides is completely different."

Zhang Ruolin didn't quite understand what Kun Qiming meant.

Kun Qiming explained:

"These two large contiguous areas of land, No. 1-15, not only have three levels of access, but the plots are planned in an orderly manner and there are roads."

"As for the 16-25 plots, to be honest, many residents have not yet moved out. It is said that the demolition contracts have been signed, but the progress is too slow, and there are still some people who have not left."

Zhang Ruolin was a little confused.

From this point of view, it seems that you have 10 plots to choose from, but in fact you cannot use any of them.

Not to mention a month later, at least half a year later than Mo Yuchen, or even longer.

Zhang Ruolin thought to himself: What does this spring list mean? How is it different from a bad check?

When Zhang Ruolin was about to call Quanliang, Wukong said:

"Brother, people from the design institute have arrived. I'll go greet them."

Zhang Ruolin thought to himself: It is better to listen to the opinions of experts first, and then decide whether to call Quanmanliang.

Not long after Wukong left, he walked in with a middle-aged man.

The man is tall but thin, with a pair of obsidian black rimmed glasses perched on the bridge of his high nose.

The lips are very thick, giving Zhang Ruolin a capable and solid feeling.

Wukong said:

"Brother, this is Chief Engineer Li from the Design Institute. He made our first version of the plan for us."

He looked at Mr. Li and said:

"This is my eldest brother Zhang Ruolin, these are Luo Ran, Gao Pi and Kun Qiming."

Chief Engineer Li stretched out his hand to shake Zhang Ruolin's hand, and then nodded to the others.

After inviting General Engineer Li to sit down, Zhang Ruolin was not polite and said:

"General Engineer Li, we need to ask you to check this project more. None of us have much experience."

Chief Engineer Li is a person with a rigorous attitude. After he looked at Zhang Ruolin, he replied:

"Mr. Zhang, I am very interested in the project you are going to invest in, so there is no need to be polite to me."

"Speaking of which, not long ago, a company from Oshi Capital also asked our institute to do design, and the two contracts have been signed."

"Originally I didn't agree with this plan, but as you know, as a small chief engineer, I can't stop it even if I want to."

"Please don't mind."

Zhang Ruolin said with a smile:

"General Engineer Li, if we mind, we won't let Wukong invite you again, so we must not only cooperate, but also cooperate better."

Chief Engineer Li replied:

"As long as you can trust me, I will do my best."

Wukong said hurriedly:

"We are one family to begin with, why do we have to speak two different languages. This is the situation here now."

"The original site selection for that plan has been snatched up by others. We need to select a site on a new plot of land, and the plan also needs to be changed."

General Engineer Li nodded seriously and said:

"Xiao Wu, you just said that we got a land planning map here. Let's take a look at it together."

At this time, Kun Qiming handed over the drawings. When Chief Engineer Li looked at it carefully, Kun Qiming said the same words just now.

Everyone saw that the expression on Mr. Li's face changed quickly, shaking his head for a while and thinking deeply for a while.

An overview of plots 16-25 came to his mind, and only such a local veteran designer could immerse himself in the scene without going to the site.

The office was extremely quiet at this time, and you could probably hear a pin drop.

A full half hour passed.

When Zhang Ruolin saw Chief Engineer Li looking at the picture, his frown gradually relaxed.

In the end, Chief Engineer Li showed a very satisfied smile, but Zhang Ruolin also breathed a sigh of relief.

Chief Engineer Li looked at the few people with a smile, and pointed to plot No. 25 on the drawing.

said:

"If I remember correctly, this land should contain an electric power substation and a large warehouse for storing electric power supplies."

"A few months ago, I visited this place because of the increase in power capacity and because it is an old station that has been built for decades."

"In order to ensure that the future developments in Longshi South District will not be short of electricity, the government moved the entire building and built a new one."

Kun Qiming seemed to have remembered it and said:

"Yes, yes! There is indeed a substation and warehouse on the half-slope, and they are no longer in use."

"What General Engineer Li means is that we set the location of the data center project here?"

General Manager Li smiled heartily and said:

"If we decide to build it here, there are three advantages. When we built the station, we took geological issues into consideration, so the foundation here was very solid."

"This is an advantage for the disaster stability of the data center building."

"The second advantage is that the road to the station has been built early, so even if a heavy vehicle enters, there will be no problem."

“It can save a lot of costs.”

"Of course the most important thing is that this station is not very far from the new station. For the data center, the supply of power is also a top priority."

"It would be safe if we could negotiate with this side and set up a dedicated line at intervals."

Zhang Ruolin never expected that he would actually pick up a treasure when he thought he was the most passive.

On plot No. 25, you can have such a half-sloping land for your own use.

Not only did it save a lot of money on civil construction, but it also gave priority to resources. I was really lucky.

Zhang Ruolin said impatiently:

"General Engineer Li, I have to ask you to come with us to the site now. If there is really no problem, we will choose the location here."

General Engineer Li shook his hand and replied:
Chapter completed!
Prev Index    Favorite Next