Font
Large
Medium
Small
Night
Prev Index    Favorite Next

Chapter 234 Phase III Project

First of all, the corresponding policy incentives related to factories built in Jiangsu, Zhejiang and Shanghai will reduce all industrial electricity bills, which means that Zhou Zhen can save a lot of money if he builds factories in Jiangsu, Zhejiang and Shanghai in the future.

After all, factories currently consume much more electricity than ordinary residents, especially the industry Zhou Zhen is currently engaged in is a heavy power consumer.

If the corresponding electricity bills are reduced or exempted, it means that millions or even tens of millions of electricity bills can be saved in a year.

You must know that the amount of electricity consumed when producing chips is not a small amount, and even the electricity consumed can account for nearly 20 to 30% of the cost of chip and OEM production.

At the same time, the corresponding screens and smartphone unmanned factories require a large amount of power to support the operation of the factory.

The reduction of electricity bills is good news for Zhou Zhen.

After all, we are building a power station corresponding to tidal energy, and Zhou Zhen does not need to pay a penny. Even the corresponding construction team is arranged by the above, which means that Zhou Zhen only needs to provide the corresponding technology.

At the same time, projects such as power stations, based on the current domestic electricity bills, are basically in a state of balance relative to the balance of payments, and even the expenditure is greater than the income.

From the investment and construction of power stations, to the pulling of cables and wires, as well as the corresponding maintenance of generators and cables and wires, and the corresponding annual safety inspections, these are all investments required.

Although it can produce 30 billion kilowatt-hours of electricity every year, it is equivalent to 30 billion kilowatt-hours of electricity. According to the current domestic average residential electricity unit price of 6.7 cents per kilowatt-hour.

The income that can be obtained in a year is only close to 20 billion.

But the corresponding revenue will definitely not reach 20 billion. After all, when the corresponding output of electricity is sold to specialized industrial factories, the overall pricing will basically give the factories certain discounts.

In addition, many public facilities in the city also require a large amount of electricity, plus the corresponding maintenance costs, as well as the corresponding salary expenditures for power grid staff and grassroots personnel, the overall income is close to seventy-eight dollars a year at most.

Just one billion.

Of course, after accounting for other expenses, it is already very good to be able to maintain the revenue and expenditure costs of a power station and have a certain amount of small income every year.

According to Zhou Zhen's current estimate, the corresponding construction of this power station will cost nearly more than 20 billion. Adding the corresponding equipment procurement and cables, it will take at least 30 billion to complete the corresponding tidal energy power station.

Moreover, this time the tidal energy power station was built above the sea, and its construction was much more difficult than expected. At the same time, the lifespan of tidal energy power generation equipment is relatively short.

After all, there is a lot of salt and other minerals in the sea surface when these power generation equipment are in contact with the sea. When they come into contact with the corresponding generators and other auxiliary equipment, they will cause unnecessary erosion damage.

According to Zhou Zhen's estimation, the generators and corresponding equipment basically need to be checked every year, and the corresponding equipment needs to be replaced every five years, and the replacement cost basically accounts for half of the entire power station construction cost.

This means that if Zhou Zhen currently wants to make money from power stations, he has no other option but to increase the price of electricity.

But Zhou Zhen understood that there was no difference between doing so and committing suicide.

After a series of considerations and the current development strategy required by the company, it is a very good choice to hand over the operation and management rights of this power station to the current Huaguo Power Grid.

On the other hand, relying on corresponding preferential policies, the annual Zhou Zhen supply chain system can also save most of the money to invest in research and development and production, bringing more profits to the company.

And by using this matter to establish a good relationship with the above, the company can also get corresponding policy support in its future development, so as to develop more smoothly in the country.

In Zhou Zhen's view, his system is currently rooted in China. Although it is said that it will be oriented to the entire world in the future, its roots are still in China.

And now most of the company's revenue comes from domestic sources, which requires Zhou Zhen to work hard to run the company well.

After the corresponding Huaguo Power Grid and construction teams arrive at Rouyu New Energy Company, they can begin the comprehensive construction of the corresponding tidal energy hydropower station.

Soon the staff of Huaguo Power Grid contacted Zhou Zhen's Rouyu New Energy Company and provided Zhou Zhen with the development process of this tidal energy supply station.

This time the construction period of the tidal energy hydropower station is divided into three construction periods.

The first phase of construction is to build a 3×2 double-layer tidal energy hydropower station by August this year.

And start the corresponding input test. If the difference between the input test level and the predicted power generation level is not large, the second phase of the project can be started.

The second phase of the project is to expand the hydropower station into a 7×2 micro-U-shaped tidal energy hydropower station on the original basis.

This is expected to be officially completed in March next year, and basically the prototype of the corresponding tidal energy hydropower station project is already in place.

After corresponding results are obtained, the corresponding power generation capacity will be tested. If the power generation capacity reaches the standard, a full-scale tidal energy hydropower station of 15 times 2 will be completed within the third phase of the project.

The project time limit is one and a half years, and within this year and a half a new power station will appear on the East China Sea.

If the construction of this project is completed, the entire eastern coastal area will be able to truly achieve power freedom.

There is no need to spend a lot of energy on transmitting electricity from west to east.

If the power generation level of tidal energy and the corresponding cost consumption can meet the current domestic energy situation, perhaps tidal energy power stations in the future can become an important part of the domestic power generation system.

As a partner this time, Zhou Zhen naturally welcomed the other party's arrival and expressed his full support for the construction of the project.

And provide the other party with very sufficient technical support.

According to Zhou Zhen, the earlier the entire current tidal energy power station is built, the more beneficial it will be for the current development of the company.

After having a conflicting power supply, Yuzhen Semiconductor's chip foundry can truly start producing high-power chips.

After corresponding discussions, the project will officially start in early April, and Zhou Zhen has also sent technical personnel to fully support the construction of the tidal energy hydropower station.

Time has slowly arrived in April. In the first half of this year, the domestic mobile phone market has released its own flagships. However, the flagships released by domestic mobile phone manufacturers this year have not caused much response in the market.

It rises brightly and falls darkly! It is ruined!

These labels have been heavily attached to various mobile phone manufacturers. After all, the current flagship mobile phones released by various mobile phone manufacturers do not have much improvement compared to the flagship phones of the previous two years in terms of overall hardware configuration parameters.

promote.

Coupled with the constant failure of Fire Dragon and the mixing of corresponding OEMs, consumers have to draw lottery when buying mobile phones. This makes the current domestic mobile phone market very sluggish.

Especially this year, the overall sales of flagship mobile phones of various manufacturers have experienced a corresponding plunge in sales compared to last year.

On the contrary, last year’s Fire Dragon 888 model has gradually been valued by users after half a year of development.

In particular, in order to clear inventory, various manufacturers also carried out a wave of price cuts for the Fire Dragon 888 released in the second half of last year.

It has caused countless users to set their sights on these flagship mobile phones released in the second half of last year.

The price of the rice phone 11sultra jumped from 6,499 yuan to 4,699 yuan in early April.

This directly made most users say that this product is really delicious.

This price is basically the same as the price of the rice phone 12pro.

Both use the same screen, but the rice 12 pro uses the Fire Dragon 8gen1, which is a mixture of TSMC and Sansang, while the rice 11sultra uses the more stable version of the Fire Dragon 888 from TSMC.

At the same time, in terms of corresponding image photography, the image photography of the previous generation flagship rice phone directly surpassed the current rice phone 12pro, and combined with the more high-end ceramic back cover, the rice 11sultra is even more fragrant.

In addition to the price reduction of rice phones, the two flagship phones of Blue Factory also had corresponding price cuts, but the price reduction was only a thousand yuan.

Although the price is only reduced by one thousand, the overall product performance and cost-effectiveness are obviously better than this year's products.

At a time when manufacturers and users are miserable, the emergence of MediaTek's processor chips has indeed given users a slight sigh of relief.

MediaTek's processor, this year's Dimensity 9000, performs really well. Even at the end of March and early April, various mobile phone manufacturers began to launch some products equipped with Dimensity 9000 processor chips, which have won the support and support of most users.

Recognition.

It's just that Dimensity seems to have low production capacity due to the production of processor chips, which has led to many current models equipped with MediaTek processor chips being out of stock one after another.

Of course, after discussions among industry insiders, everyone finally discovered that most of MediaTek's processor chips are basically supplied to Honor.

Among them, nearly half of MediaTek’s Dimensity 9000 and Dimensity 8000 chips are supplied to Honor. The Dimensity 9000 processor chip is even exclusive to Honor.

Among the half of the chips it sells, Redmi's k50 series has taken away a large part, which also means that some manufacturers do not have many MediaTek Dimensity processors.

However, MediaTek said it will increase production capacity and strive to supply more processor chips to manufacturers this year.

After all, MediaTek understands that now it wants to defeat the Fire Dragon, so MediaTek's Dimensity chips will be the industry leader.
Chapter completed!
Prev Index    Favorite Next