typeface
large
in
Small
Turn off the lights
Previous bookshelf directory Bookmark Next

Chapter 368: Work has started

Time flies by very quickly, and in a blink of an eye, it’s time for trial production.

It can be said that Li Lei was the most nervous one at this time, because he had to learn to operate, and at the same time learn to visually inspect the working performance of concrete, and be responsible for the quality of the first truck of concrete. If he did not do it well, the consequences would be serious.

Of course, the trial production will not be operated by Li Lei or others. It will be completed by the engineers of East China Construction Machinery. They have to stand aside and learn the actual operation, because after the trial production is successful, the engineers will hand over the operational responsibilities to them.

Two days ago, the company recruited another operator, named Huang Shuming, who is from the same hometown as Li Lei and comes from Neijiang, Sichuan.

For this trial production, all the management personnel of Jiatai Company are very busy, because the boss is a bit superstitious, and there can't be any problems in today's trial production, otherwise it will be a bad luck and business will be affected.

The rooster and firecrackers are all ready.

The big boss, Yu Changhua, and two small shareholders came to the trial production site. After all, the investment in this concrete mixing station was several million, so it was impossible for the bosses not to pay attention to it.

Yu Changhua can be said to be one of the cross-border representatives. He originally opened a hotel. Seeing that commercial concrete is now very profitable, he joined two friends who were engaged in construction and jointly invested in the establishment of Suzhou Jiatai Concrete Co., Ltd.

Li Lei and the others felt very uncomfortable when they saw their boss coming. They were afraid that they would be noticed by the boss. If they made the boss unhappy, they would be fired on the spot, which would be troublesome.

The big boss Yu Changhua is as fat as a ball and has a slicked back hair. Li Lei heard that the boss is very cruel. Even the company's vice president, production manager and other management personnel have been scolded by him.

However, Yu Changhua was very polite to Zhang Jianzhong. Li Lei thought that maybe it was because the director had skills and graduated from a prestigious university. I heard that the boss spent a lot of money to poach someone who was quite influential in the commercial concrete industry in Suzhou.

.

A group of managers surrounded Yu Changhua and came to the mixing building.

Yu Changhua said with a smile on his face: "Yes, yes, everyone has worked hard. Today's trial production was successful. Let's celebrate. Is there no problem with the preparations of all departments?"

General manager Gao Bin said quickly: "Chairman, everything is ready. We are going to trial production today and are going to produce 100 cubic meters of concrete to pour our site. The mixing plant equipment has been independently tested and run, and we guarantee that there will be no problem.

.”

Yu Changhua smiled and said: "Okay, let the relevant personnel prepare and start trial production immediately."

Today, although Li Lei and his three operators don't have to go into battle, they have to do other things, such as filling out mix ratio reports and delivery orders, and taking samples for testing.

Li Lei has beautiful handwriting, so he was assigned by the director to fill out the ratio report and delivery form, so he would have to stay in the operation room all the time.

Luo Lianghua and the others had to run up and down. In addition to learning the operation, they also had to go down to help Xiaopang and the others take samples for experiments.

Before trial production, the first thing to do is to kill the chickens.

Yes, this is a custom.

Production manager Huang Tao personally carried the rooster, cut its neck with a kitchen knife, and then quickly poured the chicken blood around the concrete mixing building.

Not only do chickens need to be killed before the trial production of a new station, but they also have to be done every year when construction starts after the Spring Festival.

Li Lei heard that there used to be a mixing station that did not do these things. As a result, things went very wrong that year. There were all kinds of weird things. The most serious one was that a serious safety accident occurred at a mixing station. A worker got into the mixer to mix concrete.

When the machine was blocked, due to the operator's negligence, he turned on the machine without confirming the situation.

As a result, something very terrible happened, and the boss paid hundreds of thousands in compensation to resolve the matter.

The operator was also severely punished and even became neurotic from then on.

Li Lei was also shocked when he heard this.

Oh my god, it turns out that being an operator is such a big responsibility. If you are not careful, you can become a murderer. In more serious cases, you may even go to jail.

Regardless of whether this is true or not, in short, the customs and habits of the industry have to be done this way. This time the chicken was killed quite smoothly. After the chicken was bled, it was thrown aside without any fluttering at all.

It is said that if a chicken is not killed well, the chicken will still be able to run around even if its neck is broken. This is a very bad sign.

The chicken was killed beautifully today and the bosses seemed very happy.

At this time, trial production can begin. A brand-new concrete mixer truck was backed into the bottom of the mixing building. The driver performed well this time and was in place in one go.

An engineer from East China Construction Machinery Factory sat in front of the operating desk, opened the industrial computer operation interface, and entered the production mix ratio according to the mix ratio notification form filled out by Li Lei.

At this time, industrial computers were still very backward. The operating systems were all running on the DOS system. They didn't even have a mouse. They were completely operated using keyboard menus.

However, this is really easy for the manufacturer's engineers, but Li Lei and the others are not sure at all. If they are asked to take over from the engineers later, they probably don't know what to do and they will be in a hurry.

The operating room is not big, and after several people stood there, it seemed very crowded.

The bosses didn't come up because they were not interested in this. They only needed to look at the financial statements every month.

Under the mixing building, firecrackers have been placed. This time I bought 10,000 firecrackers. As the saying goes, when the machine rings, there is a thousand taels of gold. The bosses and managers all have red faces.

, waiting for the first truck of concrete to be successfully produced.

The engineer of the construction machinery plant rang the alarm bell three times in a row. This was telling everyone not to get close to the production equipment to avoid accidents, and that production was about to start.

After confirming that there was no one on the production line, the engineer turned on the air compressor switch, mixing host, and other equipment in sequence.

The engineer skillfully clicked on the operation interface, and the first batch of concrete production started. This is automatic batching and production mixing, so the operator does not need manual intervention under normal circumstances. He only needs to look at the operation interface. If there is an abnormality in the production equipment, the interface

You will be prompted above.

Sand and gravel are falling into the weighing scale, and the screw conveying cement and fly ash is also quickly sending the materials to the weighing hopper. You can see the measurement of these materials on the interface, changing like a progress bar.

The engineer explained to Li Lei and the others while operating, but Li Lei and the others were still a little confused for a while.

After all the raw materials were measured, all the raw materials for the first plate of concrete entered the mixing host. At this moment, the mixing host seemed to be overwhelmed and let out a long sigh, and the current of the host instantly reached more than 100.


This chapter has been completed!
Previous Bookshelf directory Bookmark Next