typeface
large
in
Small
Turn off the lights
Previous bookshelf directory Bookmark Next

Chapter 54 Construction Planning

After Chen Mo finished eating, he wanted to help his mother clean up the dishes, but she pushed her out of the kitchen. According to her, just don't bother her. The dishes and chopsticks were cleared away at once. Chen Mo's coming in would make her clean up much slower.

.

Well, my mother's kindness was fulfilled. Seeing my father watching TV inside, he went back to his house directly.

After a night of silence, he still spent time practicing. Here, he still couldn't practice the talisman because he was afraid that an accident would happen during the process of making the talisman and there might be a loud noise. This is also explained in the Jade Talisman of Chuan Gong,

Talismans must be made in a secluded and separate place, including the base of the formation!

Therefore, he could only contact calligraphy first and lay the foundation for drawing talismans. In addition, he bought a few carving knives and learned jade carving according to the instructions on the jade talismans. He had been practicing for several days.

The next day, Chen Mo didn't go anywhere. He just watched Chen Ming's workers doing the finishing work at home. The room just laid some floor tiles and painted it. He had no intention of greatly changing the layout of the home, mainly waiting for himself.

After the house is repaired, let the parents live in their own place first, and then the house will be completely demolished and rebuilt into a building. So now it is just a matter of laying the floor and building a bathroom. We can talk about the other things later.

The reason why he didn't go out today was because Chen Ming contacted the biogas construction company in the county. They wanted to send someone to conduct an actual survey, and they also wanted to talk to Chen Mo and build the entire biogas pool according to his requirements.

Chen Mo was not asked to wait any longer. At about 9:30 in the morning, two people from the biogas digester company arrived at Chen Mo's old house. All of them were men.

Chen Mo, Chen Ming and the staff of the biogas digester company discussed the construction plan with each other, and Chen Mo asked them to tell them.

The first is to emphasize safety. All equipment and facilities must be safe. Construction must be carried out in accordance with double insurance measures.

The second is durability. Ordinary biogas digesters can be used for more than ten years, but your own biogas digester must meet the 50-year usage standard.

The third is quality. Except for small accessories, large accessories must reach the end of their service life.

The fourth is construction standards, which must be of high standards and high quality.

The fifth is the double pool mode, which must ensure uninterrupted biogas. In order to ensure that one's daily use can be fully satisfied, double pools are necessary. Although the biogas pool will have biogas available as long as it is fed, from a usage perspective, double pools

It is the best, but the cost is stuck. In addition, there are also requirements for the volume of the gas pool, etc.

After listening to Chen Mo's request, the two on-site staff of the biogas digester company could only nod. The request was not high and everything was achievable, but the construction funds were extremely high. Calculated, it would cost about hundreds of thousands of yuan. For two people

They all complained secretly in their hearts, it is true that the nouveau riche are not short of money! But they were also envious. Looking at Chen Mo, he was not very big and said, how can he be so rich? Oh! What a fate!

"Do you have any questions? If so, please raise them now." Chen Mo asked.

"Mr. Chen, according to your requirements, we will complete the construction of such a biogas digester. With such a large volume and the biogas generated, if it is for household use, there is no need to build such a large one."

"Yes, I originally thought it would be used at home, but it is not necessary. But considering that I will also build a greenhouse in the future, heat the greenhouse, etc., the consumption will be large. So when you are planning the construction, you will also need to consider the

All the inlet pipes are installed in place, so that I can directly connect the pipes and use them later.”

"I see, then there are no other problems!"

After the two technicians conducted an on-site survey and recorded the actual data, they immediately promised to design for Chen Mo as soon as possible after returning, ensuring that the budget and drawings would be produced within a week.

Chen Mo didn't have anything to say. As long as the construction didn't delay the construction of the new house and didn't delay its use, everything else should be done well.

The old house was almost the same as the one next door, and there were several acres of land, so Chen Mo talked to Chen Ming about some of the later construction plans and so on.

"Uncle Ming, have you ever built a house or built a road?" Chen Mo asked.

"Haha, do you want to build the provincial road leading to the old house?" Chen Ming asked.

"Yes, how do you know, Uncle Ming?" Chen Mo asked curiously.

"Haha, of course I thought of it myself. After I visited the old house, I found that the current road is too difficult to walk. Not to mention the dirt roads, they are also a bit deserted. People can't walk on rainy days.

So I thought that if you want to build a new house here in the old house, this road, which is more than one kilometer long, must be repaired. And I happen to have experience in road construction. I am the one who built the market road in the town now.

There is no problem at all on this road." Chen Ming said with a smile.

"Okay, Uncle Ming! I'll let you build this road. But you have to give me solid materials. Although I only want to build a two-lane cement road, the load-bearing capacity must meet the national highway standards, and the road base layer should be built in accordance with the national highway standards.

, and the drainage of the roadbed must be repaired." Chen Mo said, thinking that if Hulu Valley is to be developed in the future, trucks and special construction vehicles will have to pass through this road, so if it is built now, it must be repaired and cannot be built later.

That's why we put forward such high requirements. Anyway, the current dirt road and surrounding land are within the scope of our contract. In addition, the dirt road is relatively wide and can be built into a two-lane road.

When Chen Ming heard his request, he was a little stunned. He took a breath secretly. He didn't expect the request to be so high: "Erwa, your request is too high. My construction team can't meet it, and even if it's a construction project in the county,

The team may not have CD or construction qualifications.”

Chen Mo was stunned. He didn't expect that he just mentioned a national highway standard. Chen Ming couldn't meet the requirements, which was beyond his expectation. He himself didn't know the national highway construction standards, but after checking it, he thought about it again.

I only proposed this construction requirement after thinking about its future use. I didn't expect that it would seem to be too high to meet the national highway standards.

But he didn't say anything about lowering the standards, because according to his requirements in the future, this road will definitely be used frequently, so he would rather build according to high standards at the beginning than repair it later.

"Uncle Ming, if you can't meet my requirements, then you will repair this route. Just flatten it and spread some gravel so that it won't be difficult to walk on rainy days. We can find someone who can do it later.

Just let the construction unit do the work," Chen Mo said.

"If it is a gravel road, then there will be no problem. I will do the roadbed treatment and try to get you to spend more time. Besides, if you do this, the cost will not be much. You can give me 50,000 yuan, and I will give it to you.

It’s done well.” Chen Ming said.

50,000 yuan is not high, and the roadbed and drainage must be reinforced. In this case, it is a cost price. Chen Mo nodded and agreed. He did not expect that if he wanted to do something, so much preparation work would be required.

But no matter how much work there is, he still has to do it himself. There is no turning back, and his parents are still looking at him, so he needs to use up his energy to get things done properly. Alas! It makes me cry if I talk too much!

Two days later, the tiles in the main room and bathroom of the family were laid and hardened for two days, and people could walk on them. Chen Ming arranged for workers to come over and do the caulking and filling of the brick joints, as well as the bathroom

Some of the post-work in the room can be completed in one day. Of course, there are not many requirements for the workers to do the construction, otherwise it is jointing and post-processing, which cannot be completed in three days.

Chen Mo didn't care, because he would only live in this house for another year, and it might be renovated next year, so he didn't impose strict requirements. However, he had to impose strict requirements on the new house he wanted to build.

I need to write this down and talk about it carefully when I see Uncle Ming.


This chapter has been completed!
Previous Bookshelf directory Bookmark Next