typeface
large
in
Small
Turn off the lights
Previous bookshelf directory Bookmark Next

Chapter 67: Engineering Drawings of Daqin

Super workshop.

Ying Cheng inspected the construction of the wall as if inspecting his own territory.

Dalu Mansion couldn't come up with a result for a while.

So after giving a comprehensive explanation, he came to the Super Workshop without stopping.

Look at the wall that has gone up.

Ying Cheng expressed great satisfaction.

Work continued day and night, and the fire was everywhere for two days. The construction of the wall finally made progress.

Standing on Zaoheyuan, you can clearly see a slender wall.

One look at it and you knew you couldn't pass it.

There is no cement in Daqin.

Glutinous rice juice is used to build the masonry.

The Great Wall, which has stood for two thousand years, was built using glutinous rice technology.

By mixing glutinous rice into lime mortar, the adhesion and tightness are greatly improved, and it is more wear-resistant than cement.

It's just that it's a little too extravagant.

It’s really unnecessary!

The construction of barrel walls and outer gullies is progressing steadily.

It can be said that being able to do so quickly is the most vivid manifestation of segmented construction.

In the construction of the entire fence, segmented construction was used between the two tube towers.

One hundred thousand people spread over forty miles of wall construction is not considered intensive at all.

All the materials are from the materials used in the construction of Afang Palace, so they are inexhaustible.

Looking at the progress, it will be completed within three days.

After finishing the inspection of the wall, he and the eunuch ordered Chu Xiao to get a few engineers.

If we use the positioning of later generations, this is a senior engineer or a certain chief designer.

Epang Palace was designed by these people.

Ying Cheng came to the fourteen craftsmen's workshops again, and all the components of papermaking, printing, and small tubes were ready.

Now.

All you need to do is build these materials next to the Zao River and it can be officially put into use.

Ying Cheng made a simple and direct appointment: "Xiang Likui, you are now the superintendent of the super workshop, responsible for the construction of the super workshop!"

After Ying Cheng learned Xianglikui's surname, he decisively made the appointment.

no way.

There are three surnames in Da Qin, and they are responsible for all the engineering and construction projects in Da Qin. They can definitely be trusted.

The Gongshu family, the Li family of Sichuan and Shu, and the Xiangli family.

This surname is responsible for the Gongshu family that manufactures ordnance, and the Qin arrow crossbow chariots that make the world fearful.

The Li family of Sichuan and Shu, regarding water conservancy, including Lingqu, people with this surname are carrying the orders of the First Emperor to dredge the world's rivers.

This is also a project comparable to the Great Wall and Epang Palace.

In the past, the six countries were impassable, let alone rivers, and no vassal state had raised water conservancy projects to such a high level as the Qin State.

The world-famous Dujiangyan Irrigation System and the Zhengguo Canal in Guanzhong are thousands of miles apart.

But now, Da Qin is carrying out something that will benefit the people forever. All water flows back to the rivers, and the rivers flow into the sea.

The engineering construction of Xianglishi, the Great Wall, the Nine Qin Straight Roads, Epang Palace, the First Emperor's Mausoleum and other super buildings were all designed by Xianglishi.

"Your Majesty..." Xiang Likui also wanted to say that he was from the Shaofu and was now in charge of Afang Palace.

Ying Cheng interrupted decisively: "You are responsible for building the workshop here. You don't have to worry about other things. Who will blame you? Let them come to me, Ying Cheng."

"I obey the order!" Xiangli Kui had no choice but to accept the order.

"Well, you see, this place is a big water wheel, which provides water power to turn the big water wheel. Such a turbulent water flow must be difficult. Find a way to overcome it!"

Ying Cheng was naturally not polite and said quickly:

"Here is the crusher, and here is the bronze boiling tank. It must be heated below. The materials of the crusher need to be put into the bronze boiling tank to cook."

"Afterwards, the bronze boiling tank needs to be stirred."

"After that, there will be papermaking film that needs to be lifted evenly."

"There is a sun-drying scene in front of you. It's winter now, so we need to dry it inside the house. It's best if we can make it into an earthen kang. The roof can be removed in the summer."



"We must pay attention to the continuity of each link, an assembly line process that does not stop working for 12 hours."

"Assembly line, simply put, is segmented processing."

"At the same time, each process is temporarily separated and needs to be kept confidential. In addition, you can't leave the range of the Black Armored Guards for food, accommodation, and food. It's not that I don't trust you, but the matter is serious. If it is leaked, it will bring trouble to you, Xiang Lishi."

Disaster."

"That's basically it, just look at the pictures!"

Ying Cheng basically explained everything that needed to be explained.

There is no other way. Let him build the outer wall. He can draw a straight line and say go ahead and build it.

But when it comes to workshops and building models into real objects, it’s not easy to do without some skills!

Besides, it was impossible for him to follow the construction site day and night to supervise the construction.

I can only give it a try.

It doesn't matter whether he is his person or not, he is a good person if he can be used.

"I obey my orders!"

Xianglikui immediately took the order.

Started to measure.

Ying Cheng was watching from the side, and he could leave after the picture was released so that Xiang Likui could sort it out.

But soon.

Ying Cheng felt a little numb.

After Xianglikui completed the measurements and made the overall plan, the entire design gave him a sense of graphic design.

If you add the elevation, it becomes a picture that digitizes the model plane.

This picture is no less than the engineering drawings of later generations.

In particular, many of these data are calculated.

Circles and the Pythagorean theorem have detailed solutions.

He has some knowledge of the Pythagorean Theorem. He has read "Zhou Bi Suan Jing", "Nine Numbers" and "Arithmetic Book", and has a deep theory of mathematical geometry.

This also supports the rigorous and angular architecture of this era to a certain extent.

Mathematical theories including equations, business merit, Pythagorean, today's heavy difference, insufficient win, difference, Shao Guang, average loss, Fang Tian, ​​Xi Jie and other mathematical theories have already reached a mathematical scale.

The foundation has been laid for the "Ten Books of Arithmetic" such as Jiuzhang Arithmetic and Eucommia Arithmetic.

Therefore, there is no problem in taking mathematics as one of the main subjects in Daqin.

Ying Cheng waited for a long time.

Xianglikui drew here and there without any hurry.

It wasn't until the evening that the engineering drawings were drawn.

Ying Cheng looked at it carefully and found that he could still understand it. He thought there was no problem, so he let it go ahead.

"Build a continuous gallery of rooms here. They shouldn't be too luxurious, but they must be well ventilated."

"We need to build separate warehouses in this place and that place to store many, many things."

"The room must be dry, moisture-proof, and fire-proof. It is best to isolate the warehouse to prevent a fire in one place from being implicated in other places."

"Have you seen this area? All the groups in the fourteen craftsmanship houses, each group has a workshop. You can ask Zhongzao Ling and Dazao Ling what the construction requirements are, and you can discuss the construction."

"This team of black-armored guards is your escort and is at your disposal. Remember, it is better to destroy the construction drawings than leak them."

Later, Ying Cheng took Xiang Likui to explain the entire super workshop building one by one, and finally asked: "Is there enough manpower?"

"If you don't have enough, I'll find it for you!"

Xianglikui hesitated for a moment and replied: "Other aspects are sufficient, but this is the river. This is not what Xianguan is good at."

"Who is qualified?" Ying Cheng asked.

"Weishui Hecheng, Li Jiang!" Xianglikui thought for a moment and said.

"Guo Huaiyi, send someone to capture this Li Jiang. If anyone has any questions, go to Dalu Mansion to find me!" Ying Cheng nodded and gave the order directly.

He Cheng is an official who manages rivers. His official office is in Xianyang City.

Now for Ying Cheng, if you catch someone and use it, you don't have to tell anyone.


This chapter has been completed!
Previous Bookshelf directory Bookmark Next