typeface
large
in
Small
Turn off the lights
Previous bookshelf directory Bookmark Next

Chapter 379: A feast for infrastructure giants

As the weather gradually warms up, new shoots appear on the dark and bare branches that have endured a cold winter and seem to have no life at all.

For Wu Hao and the others, they are not only welcoming the quietly coming spring, there is also good news. That is, the design plan of Haoyu Technology's new Linghu headquarters park has finally passed the review of the relevant departments and has been truly finalized.

After many rounds of revisions to the entire design plan, the final plan was finally determined. The entire park totals 2,700 acres, of which the construction area has increased from the originally designed 950,000 square meters to 1,130,000 square meters.

.

The general design plan of the initial design remains unchanged, but some details have been re-optimized. For example, the height and area of ​​the seven main buildings in the middle have been added as a whole, and the surrounding 28 auxiliary buildings have also had detailed design plans.

Then there is the planning of the entire park. The project design team also invited experts in this field to participate, which can be said to create a park-like park.

As soon as the entire design plan was announced, it received special attention from the outside world. Of course, praise and criticism were divided equally. Some praised the park for being beautiful and sci-fi and huge, while others criticized them for being blindly arrogant and seeking pleasure.

For Wu Hao and others, these criticisms have little impact. Their most important task now is to seize the time to identify the final project contractor. Such a huge project is really too short for the three-year construction period he established.

.So it is necessary to ensure that the project starts as soon as possible so as not to delay the follow-up work.

Many domestic and foreign construction industry giants are very interested in their project. A total of hundreds of companies have contacted them directly or indirectly, requesting relevant information and so on.

After subsequent contact and communication and the design plan was basically determined, many interested companies also withdrew one after another, leaving only some relatively powerful companies.

Among them are well-known domestic and international construction contractors. But now everyone in the world knows that our country's infrastructure capabilities are several positions ahead of other international contractors, and this time this project is located in China.

Therefore, although there are international contractors in this bidding project, the main competition is still a few infrastructure giants with national brand names.

After careful screening, a total of seventeen construction contractors entered the final bidding stage.

Being able to enter the bidding process means that these construction contractors themselves are very strong and have many successful and excellent construction cases. And the relevant construction plans submitted have been recognized and affirmed by Wu Hao and the relevant expert groups.

.

So now these seventeen companies are competing in the bidding meeting, in addition to the overall construction period, the other thing is the quotation.

Among them, there are three companies that everyone is optimistic about, and the most famous among them is probably China Construction. There is no doubt about the strength of this company. As for the construction plan and related planning materials, it is also very complete. Even in order to obtain

For this project, China Construction also set up a team of experts to provide very targeted research solutions on relevant construction plans, construction techniques, construction cycles, and quality assurance.

The construction plan they proposed to complete the overall construction of the seven main buildings of the center in 16 months, complete the construction of all building facilities in the park in 23 months, and complete delivery in 32 months can be said to have been generally accepted by Wu Hao and others.

approval.

As for the quotation of the overall project, they initially gave a huge quotation of 11.15 billion. To be honest, this price is still a bit high, but compared to the construction price of the headquarters of other giant companies in the world, it is still relatively cheap.

of.

The second company is also China Railway Construction Corporation, which competes fiercely with China State Construction Engineering Corporation. This construction giant also has a long history, and also has strong strength and brilliant achievements. The predecessor of this company itself came from the Railway Corps Engineering Corps. It can be said that

It is the tenacity and hard work of soldiers that has been passed down to this day and carried forward.

In order to realize the modernization of the army and the overall goal of disarmament of millions of people, all the officers and soldiers of the Railway Corps Engineering Corps, after receiving the order, resolutely took off their military uniforms and devoted themselves to social infrastructure construction without hesitation.

Being forced to change jobs and return to the local area did not extinguish the fire in their hearts, but instead became even stronger. In just a few years, the officers and soldiers, no, it should be said that the China Railway Construction Company stood up with a new look and began to undertake the construction.

A series of major projects were carried out.

They proposed a construction plan to complete the overall construction of the seven main buildings of the center in 17 months, complete the construction of all building facilities in the park in 25 months, and complete delivery in 33 months. The total report is 9.75 billion.

Yuan, which is a full billion lower than China State Construction Engineering Corporation.

The third company comes from China State Construction Engineering Corporation Limited. Although this company is not as old as the first two, it is also a domestic and international construction giant.

Its predecessor, China State Construction Engineering Corporation, was established in 1982. It is a key state-owned enterprise. With housing construction contracting, international project contracting, real estate development, infrastructure construction and municipal survey and design as its core businesses, it has grown and become a leader in China's construction industry and real estate companies.

and the largest international contractor.

It is a state-owned enterprise that does not occupy a large amount of funds, resources and patents from the country and has grown up by engaging in a completely competitive industry. It is also the only construction enterprise in China with three special-level qualifications.

Compared with the first two traditional construction companies, China State Construction Engineering Corporation is younger and more passionate, and has great ideas in many projects, especially major projects. Some innovative construction technologies and construction plans have also reached international leading levels.

level.

And this time, they brought a brand new construction plan. According to their plan, the overall construction of the seven main buildings of the center will be completed in the most extreme period of fourteen months. The construction of all building facilities in the park will be completed in twenty months.

Construction work, the overall delivery of the construction plan will be completed in 32 months. The total quotation is 10.3 billion yuan, which is lower than China State Construction Engineering Corporation, but higher than China Railway Construction Corporation.

The construction time of several companies is actually similar, but the construction plan and technology and the order of emphasis are different.

To be honest, Wu Hao and the others couldn't decide which company to choose. Fortunately, such a major engineering project could not be determined immediately. And this was just their preliminary plan. Next, Wu Hao and the others

It is also necessary to communicate and discuss with the bidding teams of these companies and come up with a final bidding plan.

This chapter has been completed!
Previous Bookshelf directory Bookmark Next